GR Engineering
2022
Thunderbox Gold Mine, Leinster – Western Australia
A$ 1.5 Million
GR Engineering engaged Dwyer Engineering for the detailing, fabrication, surface treatment, lining, pre-assembly and transport to site of tanks and chutes for the Thunderbox Stage 2 upgrade. Dwyer transported modules to site in the largest possible modules for transport, which saved overall installation costs on-site.