Thunderbox Stage 2 Upgrade Platework

Surface treatment and fabrication

PROJECT DETAILS

Client:

Alcoa World Alumina

Date:

March 2006 to May 2006

Location:

Pinjarra – Western Australia

Value:

A$ 3 Million

Address:

Pinjarra Refinery, WA

Contact:

Graeme Wyatt – 0412 927 094

Project Description:

GR Engineering engaged Dwyer Engineering for the detailing, fabrication, surface treatment, pre-assembly and transport to site of tanks and chutes for the Thunderbox Stage 2 upgrade. Dwyer transported modules to site in the largest possible modules for transport, which saved overall installation costs on-site.

Scroll to Top