Thunderbox Stage 2 Upgrade Platework

Fabrication and Surface Treatment

PROJECT DETAILS

Client:

GR Engineering

Date:

2022

Location:

Thunderbox Gold Mine, Leinster – Western Australia

Value:

A$ 1.5 Million

Project Description:

GR Engineering engaged Dwyer Engineering for the detailing, fabrication, surface treatment, lining, pre-assembly and transport to site of tanks and chutes for the Thunderbox Stage 2 upgrade. Dwyer transported modules to site in the largest possible modules for transport, which saved overall installation costs on-site.

Scroll to Top