Chlor Alkali SMP Installation

Maintenance

PROJECT DETAILS

Client:

John Holland

Task:

Fabrication and surface treatment for Jetty upgrade

Location:

Cape Lambert, WA

Tonnage:

600 tonne

Project Duration:

2011-2012

Project Description:

Dwyer Engineering was engaged by John Holland for the supply, fabrication and surface treatment of approximately 600 tonnes of structural modules for the Cape Lambert Jetty Upgrade.

Scroll to Top