PROJECT DETAILS
Client:
John Holland
Task:
Fabrication and surface treatment for Jetty upgrade
Location:
Cape Lambert, WA
Tonnage:
600 tonne
Project Duration:
2011-2012
Project Description:
Dwyer Engineering was engaged by John Holland for the supply, fabrication and surface treatment of approximately 600 tonnes of structural modules for the Cape Lambert Jetty Upgrade.