BHP Nickel West PLNSP Off-Plot Pipe Racks

Detailing

PROJECT DETAILS

Client:

Binningup Desalination Plant

Task:

2010-2011 (stage 1) & 2011-2013 (stage 2)

Location:

Binningup (WA)

Project Duration:

2010-2011 (stage 1) & 2011-2013 (stage 2)

Project Description:

Dwyer Engineering and Construction carried out detailing, fabrication, surface treatment, transport and site installation of structural steel for Binningup Desalination Plant stage 1. Dwyer Engineering had a site crew on site for six months erecting steel which had been fabricated and painted in one of Dwyer Engineering two workshops. 

Dwyer Engineering also received the opportunity to fabricate and install the 2nd stage.

Scroll to Top