PROJECT DETAILS
Client:
Alcoa World Alumina
Date:
March 2006 to May 2006
Location:
Pinjarra – Western Australia
Value:
A$ 3 Million
Address:
Pinjarra Refinery, WA
Contact:
Graeme Wyatt – 0412 927 094
Project Description:
BHP Nickel West engaged Dwyer Engineering for the construction & installation of the leach decant clarifier and construction & installation of the nickel hydroxide plant.
The Project included Detailing, Fabrication, Surface Treatment and Transport of supporting steelwork, as well as electrical and insulation scope. Dwyer Engineering managed the project from the completion of design through to commissioning.